July 18 Wuhan Secondary Structure Column Pump Cooperation Nanjing Construction Engineering Hankou North No. 3 Storage Center Project


Cooperation Client: Nanjing Construction Engineering

Cooperation Project: Hankou North 3 Hao Warehouse Center

Cooperative products: Wuhan secondary structure column pump

Cooperation time: July 18, 2018

Project Introduction: Wuhan Hankou North No. 3 Warehouse Center Project is located in Liudian Village, Panlong Village Development Zone, Huanglong District, Wuhan City. It is a key construction project of Wuhan Hankou Trade and Investment Co., Ltd. The construction area of ​​the project is 181073.4 square meters. Nanjing Construction Engineering Group was selected for the construction of No. 3 Warehouse Center Project. During this period, the construction of the concrete during the construction process was completed using the Luke Heavy Industry Wuhan secondary construction column pump. The construction of the project is divided into a warehouse, an ordinary warehouse, and a water pump house project, designed by Hubei Zhongjiang Architectural Design Co., Ltd.

中国五金商机网

Luke Secondary Construction Column Pump Hankou North No. 3 Storage Center Project Site

Customer evaluation: Luke Heavy Industry ’s secondary structural column pump has provided great help to our construction and solved the problem of difficult pouring of the warehouse beam. There will be opportunities to work with them in the future.

中国五金商机网

Luke Secondary Construction Column Pump Hankou North No. 3 Storage Center Project Site

As a well-known secondary structural column pump manufacturer in China, Luke Heavy Industry is engaged in research and development, manufacturing, and production of secondary structural column pumps, secondary structural column delivery pumps, and secondary structural pumps for many years. The production equipment is small in size and easy to move. The oil pump motor power is 5.5KW and the pumping head is 10 meters. It is a small helper for fine stone concrete transportation. The company promises to respond to the after-sales within 2 hours and provide free technical training to customers to ensure users' construction and use.

================================================== ================================================== ======
'July 18th Wuhan Secondary Structure Column Pump Cooperation Nanjing Construction Engineering Hankou North No. 3 Storage Center Project

Transparent Iron Oxide for Ink

Red Iron Oxide,Black Iron Oxide,Ferric Oxide Yellow,Ferric Oxide Pigment

TINOX CHEMIE GMBH , https://www.tinoxglobal.com