Summer decoration brush paint effect to prevent gas release double

Hydroelectricity renovation, tiling, cabinets and doors measurement and measurement, in the decoration of these processes, the time used by the hydropower reform directly affects the start time of the program. Experts suggest that water and electricity should be changed as little as possible. If there are no special requirements, the changes to the water are usually smaller. Therefore, it is particularly important to change electricity. First of all, it is best not to change the function of the initial setting of the living space. Second, try to simplify ceiling modeling. Once the ceiling shape is complicated, in order to ensure that the lighting and creating the atmosphere downlight and the number of switches will increase invisible, it will also increase the difficulty and time of the wire.


Casa Ruidu sofa Ivy paint  

Summer renovation "toxic gas" exponentially released to shorten the duration of the project, as little as possible changes in water and electricity. Summer renovations also require higher safety requirements for hydropower materials. The used pipe, tape and other materials must be able to withstand high temperatures. At present, the galvanized iron pipe is used for the line pipe. If you want a higher quality, hot galvanized iron pipe can be used to strengthen the strength and hardness of the material. The connector of the circuit is guaranteed by electricity safety.

The high temperature for a long time can easily cause the insulation tape to fall off, causing potential safety hazards. If you want a better process, you can use a connector to replace the black tape to prevent the tape from falling off at the joint.

Rain does not matter how much wood is to be dried

Given the special climate conditions in summer, there are some details that require special attention. The first is the bricklayer. In summer, the temperature is high and the water evaporates too quickly. If the material is not adapted, it is easy to crack, deform, and even fall off. Therefore, the requirements for bricklayers are relatively high. In order to ensure that tiles fully absorb water, it is best to soak in advance, suck enough water and then remove, until the surface is dry, but also for the second soaking, while fishing while using, so that water absorption of the tiles will be able to serve obediently to stick On the ground, on the wall. After plastering the floor, it is best to cover a layer of cardboard, drench it with water, and then open the window for ventilation and let it dry naturally. For plastered walls, if you run into high temperatures and do not rain for a long time, spray water regularly to make the tiles dry a little slower and stick more firmly.

Followed by carpentry. She said that another feature of the summer is heavy rain. When the air humidity is high, it can easily cause deformation of some wood products. However, judging from the current renovation process, most wood products, such as doors, floors, and furniture, are not processed on site, but are dehydrated in the factory's constant-temperature room and subjected to high-temperature compression treatment. It is not affected by the season. For the wood products made in the field, there are indeed some special requirements in summer. Formal home improvement companies generally have a complete set of construction technology system. In strict accordance with these standards, construction can avoid quality problems.

Rapid release of toxic gas at high temperatures

In summer decoration has a biggest advantage, the material is more environmentally friendly and easier to identify.

Any building material will have a little bit of pollutants, but in the summer decoration process, the grass and other grassroots are exposed, and they can volatilize their pungent taste as quickly as possible. After 7 months and 8 months of high temperature open air, the impact on subsequent use will be minimal. of.

Summer is the season to expedite the release of harmful substances such as formaldehyde in the air. From another point of view, it is conducive to examining whether the decoration materials are environmentally friendly. Taking wooden materials as an example, when the temperature reaches above 28°C and the humidity exceeds 45%, the formaldehyde will be released several times. At this time, the nose can be used to roughly determine whether the main material or the decoration material used by the decoration worker is environmentally friendly. The material with a strong pungent odor is easily rejected. In addition, at the time of construction, acceleration of release of poisonous gas is accelerated. Therefore, new homes that are normally renovated and opened in the summer are safer and more environmentally friendly.

“Summer paints are better.” Many people think that the rainy season will cause some trouble to the decoration. However, unless there is a continuous rain for seven or eight days, it will have an impact on the decoration, that is, paint is not easy Dry thoroughly. However, even if this happens, the problem will only be extended. If it is really urgency, and wants to catch up with the deadline, it is also possible for workers to use electric fans to blow walls, and it will not affect the quality of decoration. The advantages are: the high temperature in the summer, the odor is easy to evaporate, the paint dries quickly, the grinding is also timely, the glossiness of the paint can be fully manifested, and the lacquer brushing effect is the best.

Links: Practical: Waterproof Engineering Acceptance Standards for Bathrooms and Kitchens
The days of decoration are too sweet

Construction Acceptance Entrance Decoration Children's Room Decoration Paint Formaldehyde Switch Home Furnishing Function Sofa Bed Cloth Cabinet Door Kitchen Cabinet Door Floor Tile Function Sofa Bathroom Ceiling Material Bathroom Waterproof Toilet Ceiling Bathroom Tile Bathroom Door Tile Plastic Floor Tile Kitchen Tile ld Tile

Carbide Disc Slitting Cutters

Drilling bits Mining bits,Carbide Inserts Co., Ltd. , http://www.nscarbide.com