Home decoration detailed process description

Home decoration consulting - on-site housing - budget assessment - signing the contract - on-site delivery - material acceptance - mid-term acceptance - late acceptance - completion of the project - home improvement

Home decoration consulting

The client consults with the designer about the home furnishing design style, cost, and cycle.

(1) Negotiate

Users please decorate the company's decoration, to tell their own requirements.

The request made by the user is best discussed in advance by the whole family and the decoration company should be told as soon as possible.

The decoration company will listen carefully to the user's comments and make a record. If the decoration company finds something unclear afterwards, it will contact the user until it is fully understood.

(2) Design

After the decoration company receives the user's floor plan, the designer will personally go to the site to measure and observe the site environment, study whether the user's requirements are feasible, and obtain the on-site design inspiration. Initially select some material samples to introduce to the user. If the user agrees, the designer will further provide detailed drawings and itemized quotations. At this time, the user should provide the decoration company with the furniture and equipment information to be used. With design.

The drawings and quotations finally provided by the decoration company should clearly indicate the size, practice, materials (including brand, model), and price of each part. For example, the uniform item “kitchen cabinets” cannot be used to summarize the detailed items. If some of the cabinets are made up of many small cabinets, the user should be aware of the model, size, and related accessories of these small cabinets.

After the user receives the drawing and quotation, they must read it carefully to check the renovation project that you requested, whether the decoration company has provided it completely, and whether there is any missing item. Often many users care only about the last total quote. If this total quotation does not include the items the user needs, then you will suffer economic losses.

If you are not sure what this furniture looks like after finishing it, ask the decoration company to provide a perspective view of the piece of furniture. Unclear to ask, it is inappropriate to change until you are satisfied. From negotiation to design completion, the design time for small and medium-sized homes usually takes 2 to 4 weeks.

On-site measurement

From the designer to the customer's room to be renovated, conduct on-site surveys and conduct comprehensive surveys to make the home improvement design more scientific and reasonable.

(1) Quantitative measurement: Mainly measure the length and width of the room and calculate the area of ​​the room with different uses.

(2) Positioning measurement: It mainly indicates the position of the door, window, and heating cover (the number of scalars for windows).

(3) Height measurement: The height of each room is mainly measured.

After the measurement, a plan of each room in the room is plotted according to the ratio. The length and width of the room are marked in the plan, and the positions of the doors, windows and heating covers are specified in detail, and the positions of the newly installed furniture are marked.

Budget assessment

According to the design style chosen by the customer, the designer carries out the home improvement design and feedback from the customer to finalize the design plan, drawings and related budget.

Subcontracting materials refers to the commissioning of the purchase of decorative materials to the decoration company, and the decoration company shall uniformly report the material costs and the working costs. The “cleaner” means that the user buys the materials by himself and the workers pay for the construction. The work cost is paid to the decoration company. Many users worry about using the form of contracted materials to provide decoration companies with shoddy and false reports. Opportunity, so I would like to use the "Bao Qing Gong" form, to buy decorative materials. In fact, there are many drawbacks in this practice.

(1) Renovation generally takes 30 to 40 days. Users purchase materials themselves and must take great effort and a lot of time. If the purchase of decorative materials is not timely, it is easy to delay the construction period.

(2) Users purchase decorative materials by themselves, the quality of materials is not good, because the most expensive is not the best; customers often have little knowledge of how to choose decorative materials, little understanding of the texture, use of materials, easy to buy quality price High material.

(3) Users purchase their own materials because they are often not wholesale prices because of their small quantity.

(4) Once there is a problem with the quality of the project, it is difficult to distinguish between the quality of the process and the quality of the material.

(5) The user himself buys the materials, it is very easy to cause the waste, because you do not understand to calculate the quantity, it is generally what the worker buys how much to buy.

(6) The user himself wants to hire a vehicle to transport materials, often for once, not only has high freight, but also has a low utilization rate.

(7) After the materials are left, they can't handle them, causing some waste.

Since there are so many drawbacks to "Bao Qing Gong," why are many users willing to purchase decorative materials by themselves? Because these consumers often lack proper trust in decoration companies, they believe that decoration companies buying decorative materials use inferior materials to deceive themselves, so they would rather run their own legs to buy materials. This will not only save a lot of money, but it will also be thankless. , leaving many hidden dangers for construction.

Inclusion of materials is a relatively common practice used by decoration companies. This practice can save customers a lot of trouble. The formal decoration company is very transparent, and the materials, specifications, grades, prices, fees, and processes used in construction will give you a clear list.

In addition, decoration companies often deal with material suppliers, have their own fixed supply channels, and corresponding inspection methods, so rarely buy counterfeit materials. The supplier is very clear that in the current situation of the buyer's market, it is not easy to keep a fixed big customer, and one customer will be lost if he is careless. Decoration companies will buy large quantities of commonly used materials and get a very low price.

Based on the above analysis, you will come to your own conclusion: Bao Gong Bao Bao is still better than Bao Qing Gong.

Sign the contract

Under the premise of the two parties' confirmation of the design plan and budget, the Beijing Municipal Bureau of Industry and Commerce has signed and signed the "Beijing Family Room Decoration Project Construction Contract" to clarify the rights and obligations of both parties.

In the home improvement, the change project is usually referred to as an increase or decrease item. It is only on the basis of the original contract that the increase or decrease of the construction project is described in detail. Both parties to the contract negotiate each increase and decrease item and explain in detail. Every addition and subtraction of the project's practice and fee standards until the parties confirm that the co-signed endorsement is effective.

There are two points to note when signing a change contract:

First, when the two parties increase or decrease their projects, they should not be subject to the agreement reached orally, and must sign a written change contract in time.

Second, the signing of the contract of change timely through the market forensics in order to avoid future disputes.

On the spot

The client, designer, project supervisor, and construction manager will participate in the four-party discussion. The designer will explain the budget items, drawings, and special techniques to the construction manager on site and coordinate the relevant procedures.

Home decoration decoration is based on human harmless decorative materials, in accordance with the decorative design requirements that can reflect the principles of practicality, safety, economy, and beauty. With a scientific and technological process, the hexahedron fixed in the interior of the family home is decorated and decorated to create an aesthetic appearance. Practical and concrete overall comfortable indoor environment. Generally it mainly includes the following contents:

(1) Floor decoration. The ground is an important part of the home, it is renovated, mainly in color, texture patterns and other aspects of decoration and change.

(2) Wall decoration. The wall decoration is the facade decoration, which can be decorated by various methods such as plastering, painting, painting, inlaying, screen hanging and so on.

(3) ceiling decoration. The ceiling decoration is the use of a variety of materials for the construction of a variety of ceiling-free ceiling or ceiling. At the same time, necessary plumbing, ventilation, lighting, audio and other equipment must be set up.

(4) Furniture and other home equipment settings. The setting of furniture, various household appliances, and sanitary equipment is also an important part of home improvement.

(5) Settings for other items. It mainly includes home furnishings, calligraphy, potted flowers and other settings. Sometimes, these items can have a good decorative effect on interior decoration.

Home decoration strives to achieve the following three aspects:

(1) To make up for the insufficiency after the completion of the civil construction, taking into account the rationalization of life, the reasonable partition of the space, the dynamic and static environment and its frequency of use are arranged in an orderly manner, which makes the occupants' life easier.

(2) To enhance comfort and aesthetics, decoration home should be based on the principles of beauty, comfort, cleanliness and convenience, and strive to be simple and elegant.

(3) To express self-personality, and to select the decoration style of the room according to the family members' experience, personality, hobbies, and cultural qualities, fully reflecting the individual's personality.

Material acceptance

After the home improvement material enters the site, the customer can carry out the construction after acceptance.

Home decoration decoration is based on human harmless decorative materials, in accordance with the decorative design requirements that can reflect the principles of practicality, safety, economy, and beauty. With a scientific and technological process, the hexahedron fixed in the interior of the family home is decorated and decorated to create an aesthetic appearance. Practical and concrete overall comfortable indoor environment. Generally it mainly includes the following contents:

(1) Floor decoration. The ground is an important part of the home, it is renovated, mainly in color, texture patterns and other aspects of decoration and change.

(2) Wall decoration. The wall decoration is the facade decoration, which can be decorated by various methods such as plastering, painting, painting, inlaying, screen hanging and so on.

(3) ceiling decoration. The ceiling decoration is the use of a variety of materials for the construction of a variety of ceiling-free ceiling or ceiling. At the same time, necessary plumbing, ventilation, lighting, audio and other equipment must be set up.

(4) Furniture and other home equipment settings. The setting of furniture, various household appliances, and sanitary equipment is also an important part of home improvement.

(5) Settings for other items. It mainly includes home furnishings, calligraphy, potted flowers and other settings. Sometimes, these items can have a good decorative effect on interior decoration.

Room decoration strives to achieve the following two aspects:

(1) To make up for the insufficiency after the completion of the civil construction, taking into account the rationalization of life, the reasonable partition of the space, the dynamic and static environment and its frequency of use are arranged in an orderly manner, which makes the occupants' life easier.

(2) To enhance comfort and aesthetics, decoration home should be based on the principles of beauty, comfort, cleanliness and convenience, and strive to be simple and elegant.

Mid-term acceptance

The customer, designer, project supervisor, and construction manager are involved. After the acceptance, the quality report is signed and confirmed.

In recent years, due to the increasing number of disputes caused by home decoration, in order to satisfy both the decoration company and the consumer, consumers must understand how to accept. Consumers may check and accept their own home decoration according to the Beijing Municipal Home Decoration Engineering Quality Acceptance Regulations compiled by Beijing Building Decoration Industry Association.

Acceptance In addition to identifying the overall effect of decoration, the main thing is to see if the quality of the hand is satisfactory. Acceptance can be identified from the following aspects:

(1) The lighting circuit shall be laid in accordance with the regulations. The socket, lighting switch, main gate, and leakage switch shall have a certain height, and the kitchen and air-conditioning shall be laid in dedicated lines. The television antenna and telephone line shall be installed in a position convenient for maintenance.

(2) Drainage should be smooth, no leakage, backflow and water phenomenon, high-grade water parts without clamp marks and rubbing phenomenon.

(3) It is a new masonry wall to be vertical, the bricks have the same level, the seams are even and tidy, the brick joints do not exceed 1 mm, and the overall tile error is not more than 0.8 cm.

(4) It is the overall production error of the plane ceiling that does not exceed 0.5, the crack between the board and the board does not exceed 0.3mm, and the error of the plastic ceiling does not exceed 0.5mm.

(5) It is not more than 0.2mm for the wood seal line, corner line, and waist line facing panel; the angle between the line and the line mouth is not more than 0.3mm; the interface between the veneer and the plate is not more than 0.2mm; the sliding surface of the sliding door is in error Not exceed 0.3mm.

(6) The paint should be smooth, feel good, no traces of scratches, no color difference and nailing within one meter.

(7) It is the straight line of the wall surface, and there is no obvious convexity and color difference within one meter. The construction quality is related to the quality of the construction team; it is also related to the unit price of the construction project. The best way is to sign a contract between the two parties before the start of construction to clarify the decoration requirements and acceptance criteria.

Late acceptance

By the participation of customers, designers, project supervisors, and construction managers, the overall acceptance of the engineering materials, design, and process quality will be confirmed.

In recent years, due to the increasing number of disputes caused by home decoration, in order to satisfy both the decoration company and the consumer, consumers must understand how to accept. Consumers may check and accept their own home decoration according to the Beijing Municipal Home Decoration Engineering Quality Acceptance Regulations compiled by Beijing Building Decoration Industry Association.

Acceptance In addition to identifying the overall effect of decoration, the main thing is to see if the quality of the hand is satisfactory. Acceptance can be identified from the following aspects:

(1) The lighting circuit shall be laid in accordance with the regulations. The socket, lighting switch, main gate, and leakage switch shall have a certain height, and the kitchen and air-conditioning shall be laid in dedicated lines. The television antenna and telephone line shall be installed in a position convenient for maintenance.

(2) Drainage should be smooth, no leakage, backflow and water phenomenon, high-grade water parts without clamp marks and rubbing phenomenon.

(3) It is a new masonry wall to be vertical, the bricks have the same level, the seams are even and tidy, the brick joints do not exceed 1 mm, and the overall tile error is not more than 0.8 cm.

(4) It is the overall production error of the plane ceiling that does not exceed 0.5, the crack between the board and the board does not exceed 0.3mm, and the error of the plastic ceiling does not exceed 0.5mm.

(5) It is not more than 0.2mm for the wood seal line, corner line, and waist line facing panel; the angle between the line and the line mouth is not more than 0.3mm; the interface between the veneer and the plate is not more than 0.2mm; the sliding surface of the sliding door is in error Not exceed 0.3mm.

(6) The paint should be smooth, feel good, no traces of scratches, no color difference and nailing within one meter.

(7) It is the straight line of the wall surface, and there is no obvious convexity and color difference within one meter. The construction quality is related to the quality of the construction team; it is also related to the unit price of the construction project. The best way is to sign a contract between the two parties before the start of construction to clarify the decoration requirements and acceptance criteria.

Completion of the project

The home improvement project is completed and the construction site is cleaned and arranged.

Home appliance warranty

According to the contract, the home improvement company is responsible for the repair work of the home improvement project for a certain period of time.

If the user finds quality problems during use, contact the decoration company first and explain the quality problem to the decoration company. Any decoration made by the decoration company can be repaired for a period of two years. The specific issues listed below can be warranted; cracking, deformation (including veneer, tiles, wood, finished products, etc.) due to seasonal temperature differences; problems caused by construction quality, such as leaking water pipes, short circuits, etc.

How to solve the quality problem during the warranty period?

During the warranty period, there are quality problems. The user can directly find the person in charge of the company where the original construction team is located. If it is confirmed that it belongs to a construction quality problem, the decoration company must unconditionally change the materials for the user and not relocate. If the decoration company refuses to provide warranty for the user, the user can directly complain to the quality inspection department of the home improvement market, and the market management department will order the decoration company to provide unconditional warranty for the user or guarantee the user directly from the market.