Waterproof construction jingle encounter problems without fail

Waterproofing in waterproof construction such as basements, roofs, and toilets is a very distressing problem. There are reasons for the waterproof material, and there are also the reasons for the process. In the following form of doggerel, Kangfu Lejia summarized the experience of various types of waterproof construction. It is easy to remember and absorb.

First, waterproof overall design

Leakage problems in the building, product quality and design.

Product quality must be reliable, excellent process raw materials.

Accurate measurement is the premise, and a comprehensive control system is in place.

Design considerations should be comprehensive and put on raincoats to ensure safety.

The solution to string water is the key, and coil construction must be full of stickiness.

Second, roof waterproof

The construction of the roof is important and the node processing should be advanced.

Yin and Yang corner expansion joints, additional processing should be focused.

There is a particular emphasis on paving, and there are requirements for a vertical seam.

The lap joints should be staggered and the construction be baked out of asphalt.

Product quality is very good, careless construction counts as white.

Third, the basement waterproof

Underground waterproofing requires strict, garage floor side wall surface.

The floor is best to be empty, enough to settle the damage.

Side wall bonding to see the scene, outside the paste inside the paste is not the same.

Piles should be handled carefully and the swelling strips tied up.

Waterproof to protect, follow-up damage fierce.

Fourth, bathroom waterproof

Indoor waterproofing should be safe and the grassroots level should not be turned down.

The effect of dust is also great and delays the construction quality.

Do not have water vapor, bulging foam is very anxious.

Large-scale construction is behind and priority is given to small nodes.

Brush a layer of paint first to strengthen the mesh.

It is recommended to construct it three times, dry it, and then make the next layer.

Apply the film two or three times and brush it vertically.

Film protection is very important, rework no money.

All dry for two days, the closed water test is safer.