What should be taken into consideration before installing the shower room

What should be taken into consideration before installing the shower room

Wall Impervious Treatment - The rough house wall of a real estate company is not waterproofed. Before applying a tile, a layer of impervious cement should be scraped and then tiled. After finishing the tile, the decoration worker is required to Tile seams are used for wall joints to prevent bathroom water from permeating through the brick seams to the exterior walls, thereby avoiding the hassle of patience. Treatment of Drainage and Floor Drainage—To prevent deodorants and prevent infectious diseases, the State requires that a concave goose neck curved pipe be designed for the construction, and the toilet floor should have a first level drainage, but once the water seeps through the ground or the water supply pipe. The entire restroom of the toilet will be filled with dirty water, and the water will not penetrate into or through the wall and penetrate into the corner of the room or into the lower layer. Therefore, in the bottom of the concave pool should be set to two drainage pipe mouth, in the ground with a seepage cement scraping a good brick seam, if the home improvement do first- and second-level drainage system, eliminating the many annoyances in the future.

Bathroom Design Shower Room Features

Today, with each passing day, people are increasingly pursuing the culture of sanitary ware. Designing a simple and practical shower room in the bathroom has become a fashion. Choosing a quality shower room not only allows us to enjoy the pleasure of showering, but also avoids the tedious and frequent cleaning of dirty water spills. Therefore, we should pay attention to the effect of dryness and humidity on the premise of having a warm function. Carefully build professionally produced shower room series, in terms of user-friendly design, watertight enough to ensure that your bathroom's dry and wet distinctions, add grace to your bathroom life.

Designing a shower room

When designing the shower room, first consider the size of the bathroom, choose the layout that best suits your own bathroom, and choose your own frameless or framed product based on your preferences. Then, to the bottom of the treatment (with stone basins, stone base) selection, bathroom sill, toilet seats, bathtubs, wall columns, from the wash basin, toilet distance, open the way to comprehensive design, a comfortable and pleasant The shower room is the perfect design.

Combination of shower room style and bathroom size

For the size of the bathroom, select the appropriate shower room product. The large space can be considered from the perspective of comfortable and loose showers, with multiple options, while the small space has to make full use of the area, to choose some push-pull designs and interior design that do not occupy the place as well, combined with the boutique rack, go To make full use of space, you should also consider the combination of the overall effect of the shower and the bathroom when choosing the style. The shape (such as square or arc) should be coordinated with the shape of the wash basin and the toilet, and the reasonable layout should create a relaxed environment. Please refer to Design suggestions for store salespersons!

Non-standard shower room program

The best way to choose the shower room is to design the appropriate size in advance and to pre-embed the corresponding hole position before the bathroom is not renovated. If the water supply system has been installed and tiled floor tiles are attached, there should be a tailor-made shower room. Design shower room can choose standard, can also be based on the size of the bathroom, the actual situation of professional non-standard build, and to buy the shower room building materials market, first of all, need to have clearly marked size of the bathroom structure diagram for the store salesperson reference design , You can also invite professional designers to design on the site, draw the drawings on the basis of the overall site conditions and their own preferences, determine the factors are complete, and then arrange for the manufacturers to produce. Non-standard shower room production cycle and transport time is about 20 days, then, the factory professional installation of technical personnel can be installed.

Bathroom Renovation Decoration Experience Decoration Material Toilet Space Decoration Design Cement Simple Bathroom Door Bathroom Door Size Bathroom Size Overall Bathroom Bathroom Design Bathroom Waterproof Bathroom Tiles

Gamma Polyglutamic Acid

Hyaluronic Acid,Hyaluronate Sodium,Sodium Hyaluronate

Sinochem Qingdao Co., Ltd. , http://www.chsurfactants.com