Shenzhen Universiade closed road details

Details of the road closure at 17:25 to 17:55 on the 12th: Temporarily closed South from Hongmian Road, north to Longxiang Avenue (from Huangge Road to Shuiguan Expressway), and from Huangge Road in the east to Longxiang Grand Road to Red The intersection of Cotton Road) and the road in the west to the Grand Canal Village (including Longxing Avenue).

At 12 o'clock on the 12th, the closing ceremony was completed: Closed the south side of Binhai Avenue (including the south side of Binhai Avenue), Shahe West Road, the north of Dongbin Road (including the half width of the road on the north side of Dongbin Road), Houbin Road (Including Houhai Road) Within the area, vehicles will pass through the opening day's valid documents.

On the day of the opening ceremony, athletes will be transported in parallel on two lines, and temporary control will be implemented on the areas where the team travels. When the starting teams of the two lines are in parallel at Longxiang Avenue, Shuiguan Expressway, Nanping Expressway, Liuxian Avenue, and Shahe West Road, temporary traffic control is imposed on the roads along the line, and the team subsequently releases the post-control.

At 17:15 to 19:10 on the 12th, the traffic lanes of Binhe Avenue and Binhai Avenue will be temporarily closed to Nanshan Shenzhen Bay Sports Center. In addition, the team will enter Binhe and Binhai Avenue from Xinzhou Road and the traffic police will remind the public to avoid using Shennan Xinzhou Interchange and Binhe Xinzhou Interchange. During the opening ceremony, from 19:00 to the end of the opening ceremony, the two-way traffic lanes of Binhai Avenue (from Nanhai Interchange to Qiaocheng East Interchange) and Shahe West Road (from Binhai Shahe Interchange to Dongbin Section) will be temporarily closed.

Fixtec Marble Cutters

Fixtec Power Tools Co., Ltd. , http://www.fixtec-tools.com